How to price a contractor's BOQ against your own price list

Updated · 9 min read

The short version

Pricing a BOQ as a trader is a different job from a contractor's estimator pricing the same document. The estimator prices labour, plant and overheads. You price materials against your own price list, in the units you actually sell, for one customer, from the stock you actually have.

The workflow is the same every time:

  1. Read the BOQ and split it into single lines.
  2. Match each line to an item code in your price list.
  3. Convert the BOQ unit into your selling unit, rounding up.
  4. Apply the customer's price tier or discount.
  5. Check stock for every line.
  6. Flag what you are not sure of instead of guessing.
  7. Total it, show VAT at 5% separately, and send.

The rest of this guide goes through each step with worked numbers. All prices below come from the sample price list in our demo (a fictional trading company, AED excluding VAT). They show the arithmetic; they are not market rates or any brand's prices.

What a contractor's material BOQ looks like

A material BOQ usually arrives as an Excel sheet or a PDF, sometimes as photos on WhatsApp. It is split into sections (concrete and masonry, finishes, plumbing, electrical) and each line has an item number, a description, a unit and a quantity. The rate and amount columns are empty: that is your job.

Typical lines look like this:

Item Description Unit Qty
A.6 High yield deformed bars, Grade 460B to BS 4449, 20 mm dia Kg 8,750
A.8 Hollow concrete blocks 200 mm thick, 7 N/mm², external walls m² 1,450
B.1 Porcelain floor tiles 600x600, matt, light grey, R10, RAK or approved equivalent m² 850
C.1 uPVC soil and waste pipes 110 mm dia to BS EN 1401 LM 400
B.9 Interior acrylic emulsion paint, matt, white, two coats m² 3,800

Three things stand out. The quantities are in the designer's units (m² of wall, linear metres of pipe), not yours. The specs matter (thickness, strength, finish, standard). And "or approved equivalent" means you may offer another brand if it meets the spec.

Step 1 and 2: split the lines and match them to your list

Go line by line. Never price a whole section from memory. For each line, find the item code in your list that meets the spec, and write the code next to the line.

Watch for the words your counter uses that the BOQ doesn't, and the other way round:

  • "Sariya" or "steel" is rebar. "T12" is a 12 mm bar.
  • An "8 inch block" is a 200 mm block. A "6 inch" is 150 mm, a "4 inch" is 100 mm.
  • "4 inch" PVC pipe is 110 mm outside diameter. "3 inch" is usually 75 mm.
  • "Ditto" in a BOQ means "same description as the line above", with only the change shown. "Ditto, 12 mm dia" is the same rebar spec in 12 mm.

When the BOQ names a brand, note whether it says "or approved equivalent". If it does, you can quote your equivalent, but write the brand you are quoting on the line so nobody is surprised at delivery.

Step 3: convert the BOQ unit into your selling unit

This is where most money is lost. Convert, then round up to whole selling units. Our BOQ unit converter does these sums; here is what is behind them.

BOQ line Conversion Selling quantity
1,450 m² of 200 mm hollow block wall 1,450 × 12.5 blocks per m² 18,125 pcs
850 m² of 600x600 tile, 1.44 m² per box 850 ÷ 1.44 = 590.28 591 boxes
8,750 kg of 20 mm rebar 8,750 ÷ 1,000 8.75 tons
400 LM of 110 mm uPVC pipe, 6 m lengths 400 ÷ 6 = 66.67 67 lengths
3,800 m² of wall, two coats, 18 L pails 3,800 × 2 ÷ 10 m²/L = 760 L; 760 ÷ 18 = 42.2 43 pails

The assumptions behind these figures:

  • Blocks. 12.5 per m² comes from a 400 × 200 mm face (0.08 m² per block). It treats 400 × 200 as the size including the mortar joint. If your block is a full 400 × 200 with a 10 mm joint on top, the true count is nearer 11.6 per m², so 12.5 leaves a small margin for cutting. Either way, say which figure you used.
  • Tiles. Take the m² per box from the box label or your list, never from memory. Two tiles of the same size from different factories can pack differently.
  • Rebar. Rebar is sold by weight. To give the site a bar count, use the nominal mass: 20 mm is 2.47 kg/m under BS 4449, so a 12 m bar is 29.64 kg and 8.75 tons is about 295 bars. The rebar weight chart has every size and bars per ton.
  • Paint. 10 m² per litre per coat is an assumption for this example only. Coverage depends on the product and the surface, and the manufacturer's data sheet always wins over a rule of thumb.

Step 4: apply the customer's price

Use the price for this customer, not the counter price. If your contractor accounts have tiers or agreed discounts, apply them now and keep the list rate visible to yourself so you can see your margin.

Here are the five lines priced from the demo price list, for a customer on a 4% discount:

Item Selling qty Unit Rate (AED) Amount (AED)
Block hollow 8" 200 mm 400x200 7N 18,125 pcs 3.74 67,787.50
Porcelain tile 60x60 matt light grey R10 591 box 58.03 34,295.73
Rebar T20 B500B 12 m 8.75 ton 2,642.11 23,118.46
uPVC pipe 110 mm × 6 m BS EN 1401 67 length 65.65 4,398.55
Interior emulsion matt white 18 L 43 pail 172.43 7,414.49
Subtotal at list 137,014.73
Less 4% customer discount −5,480.59
Net total 131,534.14
VAT at 5% 6,576.71
Total including VAT 138,110.85

VAT in the UAE is charged at a standard rate of 5% (Ministry of Finance; FTA). Show net, VAT and gross as three separate figures. The contractor needs the net figure to compare suppliers and the gross figure to pay you. See VAT on quotations in the UAE for the details.

Step 5 and 6: check stock and flag what you are not sure of

A low price on something you can't deliver loses the next order as well as this one. Check closing stock for every line before you send.

In the demo price list, the block line needs 18,125 pieces against 18,245 in stock. That is fine at the net quantity, but if the contractor adds a 5% allowance (19,032 pieces) you are short. Say so on the quote.

Mark a line "Check" rather than guessing when:

  • the spec is ambiguous (is "gypsum board 12mm" a 12 mm board or the standard 12.5 mm?);
  • you had to assume a conversion figure (coverage, waste, pieces per m²);
  • stock is short, zero, or depends on an incoming shipment;
  • you are offering an equivalent brand instead of the one named.

If an item isn't in your list at all (aluminium windows or a solar water heater on a building-materials BOQ, for example), list it as "not quoted". Don't quietly drop the line. The contractor needs to know what is still open.

The mistakes that lose money or orders

  • Rounding boxes down. 590 boxes of 1.44 m² cover 849.6 m², not 850. Either the site runs short or you deliver a box free. Always round up.
  • Ignoring waste and overlap. Tiles need cuts, membranes need overlaps, blocks need cutting. If the BOQ quantity is net, either add a stated allowance or note that you have quoted net.
  • Quoting out-of-stock items without saying so. In the demo list, 10 mm rebar shows zero stock. Quote it with a lead time or flag it. Don't let the contractor find out on delivery day.
  • Missing lines. Count the BOQ lines and your quote lines before you send. They should match, including "not quoted".
  • Mixing up 12 mm and 12.5 mm gypsum board. They are different products. Price what the spec says, and ask if it is unclear.
  • Using the wrong customer price. Quoting a trade account at counter price loses the order. Quoting a walk-in at contractor price loses margin.

Why speed matters

Contractors often send the same BOQ to several suppliers at once. A common experience at trading counters is that the first complete, clear reply has the best chance of winning, as long as the price is competitive. A quote that arrives two days later may not get compared at all.

That doesn't mean sending a rushed quote. A fast quote with three wrong conversions is worse than a slow correct one. The goal is to make each step quick: a clean price list, conversion figures you trust, and a habit of flagging instead of guessing.

Tools that help

  • Excel templates. Many traders keep a quote sheet with the price list on a second tab and a lookup formula to pull rates by item code. That works well once someone has matched each BOQ line to a code by hand.
  • Your accounting system. Tally, Zoho Books or Odoo usually hold the item master, rates and stock you price from. Make sure the export or report you quote from is current, especially closing stock.
  • Automation. Tools such as RateSent read the BOQ, match each line to your own price list and mark what needs checking. In our demo, with a sample price list and a sample BOQ, a 47-line villa BOQ in Excel was priced line by line in about 17 seconds: 35 lines ready, 9 marked Check (quantity assumptions or stock) and 3 not quoted because they were not in the price list. That is demo data, not a customer result. Someone at the counter still reviews the flagged lines before sending.

BOQ pricing checklist

Step Check before sending
Split Every BOQ line has a matching quote line, including "not quoted"
Match Each line has an item code that meets the spec; equivalent brands are named
Convert BOQ unit turned into selling unit and rounded up; assumptions written down
Waste Net or with allowance, and the quote says which
Price Customer's own tier or discount applied
Stock Every line checked; shortages and lead times stated
Flag Unsure lines marked "Check" with the reason
VAT Net, VAT at 5% and gross shown as separate figures
Send Validity date, delivery terms and your contact on the quote

Questions

Should I add waste to the contractor's BOQ quantity?

Not silently. BOQ quantities are often net. Either quote the net quantity and say so, or add a stated allowance (for example 5% on tiles) as a separate note so the contractor can compare quotes fairly.

The BOQ names a brand I don't stock. Do I skip the line?

If it says "or approved equivalent", quote your equivalent and name the brand clearly on the line. If it names one brand only, quote it if you can source it, or offer the equivalent as an alternative and mark it as such.

How do I turn kilograms of rebar into bars?

Divide the weight by the mass of one bar. A 20 mm bar is 2.47 kg per metre under BS 4449, so a 12 m bar weighs about 29.64 kg and 8,750 kg is about 295 bars. Rebar is normally sold by weight, so quote in tons.

Do I show VAT on a quotation?

Show the net total, the VAT at 5% and the gross total as three separate figures so the contractor knows exactly what they will pay. Our guide on VAT on quotations covers the detail.

Sources

  1. Ministry of Finance UAE, Value Added Tax (VAT)
  2. Federal Tax Authority, VAT Taxable Person Guide (June 2018)
  3. Sulehri Consultancy, Rebar and wire rod weight tables (BS 4449 nominal mass)